Home > Research >
Updated FDOT
LOS Planning Software (LOSPLAN)
Updated FDOT LOS Planning Software (LOSPLAN)
Contracting Agency: Florida Department of Transportation (FDOT)
PI: Scott Washburn, Ph.D.
With initial program design and
development performed under a previous contract, this project was
focused on improvements and enhancements to the LOSPLAN component
programs, ARTPLAN, FREEPLAN, and HIGHPLAN, as well as the
development of a new corridor planning analysis program.
Specifically, the following tasks were addressed under this
contract: Refine the user interface of the existing LOSPLAN
programs; Refine and test the computational methodologies of the
existing LOSPLAN programs; Extend the computational capabilities of
the existing LOSPLAN programs; and Develop a new LOSPLAN component
program that would integrate the analysis capabilities of the
existing LOSPLAN programs into a corridor analysis program.
The specific accomplishments of this
project include the following: Revisions, refinements, and debugging
of the user interfaces; Revisions, refinements, and debugging of the
calculations; Revisions and updating of electronic help resources;
Refinements of the program code structures to reduce computer
resource consumption; Development of a batch processing utility;
Integration of a remote automation capability; Demonstration of the
potential for database interfacing with the LOSPLAN programs;
Revision of the XML input routine; Development of dynamic link
library (DLL) implementations of the calculations code; Development
of a preliminary version of CORPLAN.
A more detailed project summary can be
found at the following web site:
http://www.dot.state.fl.us/research-center/Completed_Proj/Summary_PL/FDOT_BC354_65.pdf
|